18:54 / 11.01.2020
808

EPSILON: Developing gas pipeline infrastructure in cooperation with Uzbekneftegaz

Photo: Epsilon

Construction of “Chigil CP – Mubarek GPP” pipeline is underway.

Total for January 11:

  • 91,0 t of pipes shipped;
  • 64,2 t of pipes arrived;
  • 121,6 km of trenches dug;
  • 167,5 km of pipes welded;
  • 117,5 km laid.

EPSILON Press Office

Top