New road and overpass opened for traffic in Tashkent
Today, October 20, a 2-kilometer highway from Chuponota Street to Tashkent Ring Road has been opened for traffic, the city administration reported.
The project for the construction of a road connecting the Sergeli and Yakkasaray districts is being implemented in two stages. To date, the construction of an almost 2-kilometer highway from Chuponota Street to Tashkent Ring Road has been completed. A 788-meter bridge and two 207-meter overpasses were built at the junction with Tashkent Ring Road.
Currently, active work is underway within the framework of the second phase of the project. A road is being built with a length of more than 4 kilometers from Tashkent Ring Road to Kipchak Street.
In total, these six-lane roads and overpasses will have a capacity of up to 12 thousand vehicles per hour. Thus, the travel time from the Sergeli district to the city center will be 20 minutes instead of the previous 40-50 minutes. The load on Yangi Sergeli Street will be halved.
Related News
16:32 / 22.06.2026
China’s LinkWise plans cloud infrastructure development in Tashkent
11:44 / 19.06.2026
Tashkent housing market shows mixed trends in May as small apartments drive price growth
19:57 / 16.06.2026
Tashkent records 47 vehicle fires in five months as officials warn over unsafe modifications and poor maintenance
18:49 / 16.06.2026