13:55 / 15.11.2019
0
669

Epsilon: Pipeline construction in cooperation with Uzbekneftegaz continues

As of November 15, 2019, 1.4 km of pipes were laid, 11.2 km were welded and 13.6 km of trenches were dug; 7,900 t of pipes (48 km) arrived and 11,700 t (72.2 km) were shipped.

Over the past day, additional 1.8 km of pipes were welded and 1.6 km of trenches were dug. 

To supply the population with natural gas during the autumn-winter period, the companies started construction of two double-line pipelines: “Nazarkuduk AP – Shurtanneftegaz” (67 km) and “Chigil AP – Mubarek GPP” (110 km). These will be transporting gas to the processing facilities.

Epsilon will keep the readers updated on the progress of construction.

Epsilon Press Office

Leave a comment.You must register to post a comment!
Top