BUSINESS | 18:35 / 14.01.2020
844
1 min read

EPSILON: Developing gas transportation infrastructure in cooperation with Uzbekneftegaz

Round-the-clock construction of “Chigil CP – Mubarek GPP” gas pipeline is underway.

Total for January 14:

  • 91,000 t of pipes shipped;
  • 69,300 t of pipes arrived;
  • 131.6 km of trenches dug;
  • 177.4 km of pipes welded into a string;
  • 120.2 km laid.

EPSILON Press Office

Related News