SOCIETY | 14:20 / 05.11.2020
827
1 min read

EPSILON (EDC): Obtaining an industrial inflow of hydrocarbons from Darakhtli field in Kultak-Kamashi block

On November 5, EDC completed workover of previously abandoned Darakhtli-1 well. The resulting post-frac daily flow rate is 150,000-200,000 m³ of gas and 10 t of oil.

The confirmed C1 and C2 reserves of Darakhtli field exceed 2.5 bcm of gas, 127,000 t of condensate and 29,000 t of oil.

The well will be connected to the main pipeline by November 7 to begin supplying the population with natural gas. 

All works fully comply with sanitary-epidemiological and environmental requirements.

Epsilon Press Office

Related News