SOCIETY | 14:20 / 05.11.2020
827
1 min read
EPSILON (EDC): Obtaining an industrial inflow of hydrocarbons from Darakhtli field in Kultak-Kamashi block
On November 5, EDC completed workover of previously abandoned Darakhtli-1 well. The resulting post-frac daily flow rate is 150,000-200,000 m³ of gas and 10 t of oil.
The confirmed C1 and C2 reserves of Darakhtli field exceed 2.5 bcm of gas, 127,000 t of condensate and 29,000 t of oil.
The well will be connected to the main pipeline by November 7 to begin supplying the population with natural gas.
All works fully comply with sanitary-epidemiological and environmental requirements.
Epsilon Press Office
Related News
08:56 / 29.10.2022
EPSILON (EDC): Karakara-1 well produces 120,000 m³ of gas per day
09:48 / 25.10.2022
EPSILON (EDC): Daily production rate of Kirkkuloch-4 well reached 50,000 m³ of gas
08:30 / 20.10.2022
EPSILON (EDC): Production rate of Yangiarik-1 well amounted to 8 t of oil per day
19:53 / 30.07.2022