Additional features
-
Night mode
Жамшид Рузибаев
17:22 / 02.07.2021
EPSILON (EDC): Increasing the industrial inflow of hydrocarbons at Talimarjon-4 well
17:22 / 21.06.2021
EPSILON (EDC): Boosting the flow rate of Nazarkuduk-1 well
17:20 / 16.06.2021
EPSILON (EDC): Increasing the production rate of Talimarjon–11 well
17:29 / 11.06.2021
EPSILON (EDC): Increasing industrial inflow of hydrocarbons at Chigil–5 well
13:54 / 05.06.2021
EPSILON (EDC): Production rate of Shimoliy Girsan-3 well amounted to 200,000 m³ of gas and 15 t of condensate per day
14:17 / 02.06.2021
EPSILON (EDC): Daily production rate of Chigil-8 well amounted to 80,000 m³ of gas