Additional features
-
Night mode
Жамшид Рузибаев
09:33 / 06.03.2020
EPSILON (EDC): Obtaining an industrial inflow of gas from new Talimarjon-9 well
09:50 / 04.03.2020
EPSILON (EDC): New Talimarjon-10 producing well’s flow rate reaches 330,000 m³ of gas per day
12:21 / 01.03.2020
EPSILON (EDC): Production rate of new Karakara-2 exploratory well reaches 350,000 m³ of gas per day
19:00 / 21.02.2020
EPSILON (EDC): Developing gas transmission infrastructure
17:45 / 17.02.2020
EPSILON (EDC): Obtaining a post-frac daily production rate of 620,000 m³ of gas from two wells
18:55 / 04.02.2020
EPSILON (EDC): 24/7 gas pipeline construction