POLITICS
SOCIETY
BUSINESS
TECH
CULTURE
SPORT
TOURISM
English
Ўзбекча
O'zbekcha
Русский
Epsilon
09:20 / 20.03.2020
EPSILON (EDC): Advanced technologies in action
14:07 / 18.03.2020
EPSILON (EDC): Obtaining an industrial inflow of gas from new exploratory well at Bakhoriston field
09:01 / 07.03.2020
EPSILON (EDC): Industrial inflow of gas obtained at Nazarkuduk-10 well
09:33 / 06.03.2020
EPSILON (EDC): Obtaining an industrial inflow of gas from new Talimarjon-9 well
09:50 / 04.03.2020
EPSILON (EDC): New Talimarjon-10 producing well’s flow rate reaches 330,000 m³ of gas per day
10:20 / 03.03.2020
EPSILON (EDC): Chigil-4 well’s daily production rate amounted to 350,000 m³ of gas
12:21 / 01.03.2020
EPSILON (EDC): Production rate of new Karakara-2 exploratory well reaches 350,000 m³ of gas per day
17:11 / 22.02.2020
EPSILON (EDC): Obtaining an industrial inflow of oil at Ilonli-1 well
19:00 / 21.02.2020
EPSILON (EDC): Developing gas transmission infrastructure
12:34 / 19.02.2020
EPSILON (EDC): Increasing production of hydrocarbons
20:05 / 17.02.2020
EPSILON (EDC): Hydrocarbon reserves increase confirmed – 21 bcm of gas, 877 thousand t of condensate and 4.6 million t of oil
17:45 / 17.02.2020
EPSILON (EDC): Obtaining a post-frac daily production rate of 620,000 m³ of gas from two wells
15:25 / 15.02.2020
EPSILON (EDC): Developing gas transmission system continues
18:55 / 04.02.2020
EPSILON (EDC): 24/7 gas pipeline construction
19:00 / 03.02.2020
EPSILON (EDC): Implementing gas transmission infrastructure development projects in cooperation with Uzbekneftegaz
More News
Top